Manchester City Council

Sustainable Transport Installing EV Chargers

Installing a home EV charger

You can install an EV charger if you have off-street parking (i.e. a driveway) and within the boundary of most homes with legal on-street parking (i.e. there are no road markings preventing you from parking directly outside your house). Please read our guidance on safe on-street charging.

As of 21 October 2026, most home EV chargers come under Permitted Development rights. This means you don’t need to apply for planning permission to install a charger if you meet the requirements. No application is needed to qualify for permitted development rights.

You may not need planning permission if:

·       The charger is installed on a house or block of flats within its property boundary.

·       The charger is mounted no higher than 1.6 metres above ground level.

·       The charger does not project more than 0.2 metres from the wall and there is at least 1.5 metres of usable pavement between the highway and the charger.

·       The property is not a listed building or in a conservation area.

·       If charging a vehicle parked on the street requires a cable to cross the pavement, an authorised cross-pavement solution is installed and approved by the highway authority – please see guidance on applying for a cable channel here.

You will need planning  permission when: 

  • The property is a listed building.
  • The installation is within a conservation area.
  • The proposed charger does not meet permitted development limits and conditions.
  • An authorised cross-pavement solution cannot be provided where the charging cable would need to cross a footway.

If you are unsure whether your proposal qualifies as permitted development, please contact the Planning Service before installing a charger.

Read more about EV charger planning requirements.

Grants

You might be able to get a grant towards the cost of installing a charger at your home. Find out more about:

If you're a business, charity or public sector organisation you may be eligible for a grant. It would contribute to the up-front costs of a charge point. Find out more about the workplace charging scheme.